Size |
72,600 square feet renovation
|
Completion Date |
2015
|
Responsibilities Naresh S. Mathur, AIA
|
Special studies (see below), Value Engineering, Cost Estimating
|
Construction Cost |
$80 million |
Provided technical studies for infrastructure upgrade
associated with hospital and central plant modernizations. Evaluated
infrastructure deficiencies, recommended solutions and developed associated
costs for up-grades. Conducted on-site evaluation of building, developed
Performance Work Statements for Design-Build RFP and prepared cost estimates
for the proposed work.
Our services included:
·
Investigation of slab-on-grade failure at the existing
hospital including on-site field density soil tests to assess structural
integrity and recommended solutions in Performance Work Statement
·
Investigation of Emergency Power Supply System (EPSS),
Transient Voltage System (TVS) and recommendations for upgrade in Performance
Work Statement
·
Investigation of Fire and Life safety systems for code and
life safety compliance and recommendations for repair
·
Cost estimating utilizing MCACES – MII (Micro-Computer Aided Cost Estimating System, Second
Generation)
·
Conducting a Value Engineering workshop
Owner’s contract
had an aggressive schedule. Our team
proactively responded with innovative approaches, concise
narratives and submission of deliverables to the owner ahead of their schedule.